Skip to content

NORRIS // READY SOLUTION

Face ID attendance tracking in Bishkek

Arrivals, lateness, schedules and a ready timesheet without manual tracking.

Face ID Timesheet

29,900 KGS

One terminal, up to 50 employees, installation, setup and a ready timesheet.

Timeline: 1 business day

01 // Client outcome

An installed system with terminal, employees, schedules and a verified report.

02 // Who it is for

Offices, retail, workshops, warehouses and multi-branch companies.

03 // Problems solved

We remove manual operations, unconfirmed states and gaps between equipment, people and reports. An installed system with terminal, employees, schedules and a verified report.

04 // PRICE

Packages, price and boundaries

Prices pending approval before publication

Face ID Timesheet

29,900 KGS

Timeline: 1 business day

One terminal, up to 50 employees, installation, setup and a ready timesheet.

Priced separately: 1C integration and automatic payroll calculation.

Select package

Timesheet + door

54,900 KGS

Timeline: 1–2 business days

Face ID terminal, attendance tracking and control of one door.

Priced separately: Building work, concealed-cable recovery, backup power and functions outside the package scope.

Select package

Multiple branches

from 119,000 KGS

Timeline: 3–5 business days

Unified attendance and reports for multiple locations; final scope after entrance mapping.

Priced separately: Building work, concealed-cable recovery, backup power and functions outside the package scope.

Select package

What is included

One terminal, up to 50 employees, installation, setup and a ready timesheet.

What changes the price

Price changes with the number of doors, zones, rooms and scenarios, cable runs, existing equipment and backup requirements. The estimate requires: Site plan, photos of panels and equipment, available drawings, target date and a responsible contact.

05 // SYSTEM

How the system works

The Face ID terminal records events, schedule rules produce a timesheet, and managers receive reports; door control is a separate circuit.

SENSORCONTROLAPP

06 // STACK

Equipment and integrations

The Face ID terminal records events, schedule rules produce a timesheet, and managers receive reports; door control is a separate circuit. Controllers, sensors, actuators and interfaces are selected after physical compatibility checks. Models are fixed in the specification.

07 // FALLBACK

If internet or power fails

Critical local functions are designed not to depend on the cloud; remote access and alerts resume when connectivity returns. Backup power is sized separately.

08 // INPUT

What we need from the client

Site plan, photos of panels and equipment, available drawings, target date and a responsible contact.

09 // LAUNCH

Launch sequence

1. Validate package boundaries. 2. Freeze points and scenarios. 3. Prepare equipment. 4. Install and configure. 5. Test every scenario and hand over instructions. Inputs for this service: Site plan, photos of panels and equipment, available drawings, target date and a responsible contact.

Diagnostics and design are separate paid deliverables. Materials are procured after scope approval and prepayment.

10 // SCENARIO

Engineering scenario

Solution diagram — not a published case study

The Face ID terminal records events, schedule rules produce a timesheet, and managers receive reports; door control is a separate circuit.

11 // LIMITS

Constraints and responsibility

Critical local functions are designed not to depend on the cloud; remote access and alerts resume when connectivity returns. Backup power is sized separately. Automation does not replace mechanical protection or manual override. Warranty covers the agreed scope; third-party work and approvals are separate.

12 // FAQ

Frequently asked questions

Will the final price match the package price?

Yes when the site fits the stated boundaries. Any change is agreed before procurement. The page states exclusions and price factors explicitly.

What is needed for an exact scope and estimate?

Site plan, photos of panels and equipment, available drawings, target date and a responsible contact.

What continues to work if connectivity is lost?

Agreed local scenarios and safe manual control continue. Cloud history, external alerts and remote commands resume when connectivity returns.

How does work start?

With project inputs and paid diagnostics or an engineering sprint. You receive a defined deliverable, not free design work in chat.

14 // REQUEST

Request for the selected service

Arrivals, lateness, schedules and a ready timesheet without manual tracking.

Send photos, video and drawings securely in WhatsApp after creating the request.

WhatsApp