01 // Client outcome
NORRIS // MINING ENGINEERING
ASIC monitoring and control
Temperatures, hash rate, power, network, alerts and controlled actions with an audit trail.
Pilot up to 10 ASIC
9,900 KGSTrial monitoring of core metrics and alerts.
Timeline: 7 days02 // Who it is for
Farm owners, mining hotels, service companies and technical teams.
03 // Problems solved
We find overloads, thermal pockets, unstable power, network gaps and recurring failures from measurements and logs. Temperatures, hash rate, power, network, alerts and controlled actions with an audit trail.
04 // PRICE
Packages, price and boundaries
Prices pending approval before publication
Pilot up to 10 ASIC
9,900 KGS
Timeline: 7 days
Trial monitoring of core metrics and alerts.
Priced separately: Parts, consumables, power and repair equipment, logistics and work outside the agreed stage.
Select packageUp to 20 ASIC
24,900 KGS + 2,900 KGS/month
Timeline: From 2 days
Monitoring connection for up to 20 devices.
Priced separately: Parts, consumables, power and repair equipment, logistics and work outside the agreed stage.
Select packageUp to 100 ASIC
59,900 KGS + 7,900 KGS/month
Timeline: From 3 days
Monitoring for up to 100 devices, roles and alerts.
Priced separately: Parts, consumables, power and repair equipment, logistics and work outside the agreed stage.
Select packageUp to 500 ASIC
149,900 KGS + 19,900 KGS/month
Timeline: From 5 days
Monitoring for a site with up to 500 devices.
Priced separately: Parts, consumables, power and repair equipment, logistics and work outside the agreed stage.
Select packageOn-premise
from 249,000 KGS
Timeline: After survey
Local server, deployment, backup and commissioning.
Priced separately: Parts, consumables, power and repair equipment, logistics and work outside the agreed stage.
Select packageWhat is included
Trial monitoring of core metrics and alerts.
What changes the price
Cost depends on capacity, ASIC count and models, cooling scheme, panel and network condition, operating mode and required test depth. The estimate requires: Site plan, photos of panels and equipment, available drawings, target date and a responsible contact.
05 // SYSTEM
How the system works
Work is based on measurements, logs and control tests; outcome boundaries are agreed before each stage.
06 // STACK
Equipment and integrations
Work is based on measurements, logs and control tests; outcome boundaries are agreed before each stage. Measurement, network and repair equipment is selected for the ASIC models and task. We do not claim unverified partnerships or manufacturer certification.
07 // FALLBACK
If internet or power fails
Critical local functions are designed not to depend on the cloud; remote access and alerts resume when connectivity returns. Backup power is sized separately.
08 // INPUT
What we need from the client
Site plan, photos of panels and equipment, available drawings, target date and a responsible contact.
09 // LAUNCH
Launch sequence
1. Measure load, temperatures and network facts. 2. Document calculations and risks. 3. Agree the upgrade, repair or training stage. 4. Test under the agreed load. 5. Hand over logs and procedures. Inputs for this service: Site plan, photos of panels and equipment, available drawings, target date and a responsible contact.
Diagnostics and design are separate paid deliverables. Materials are procured after scope approval and prepayment.
10 // SCENARIO
Engineering scenario
Work is based on measurements, logs and control tests; outcome boundaries are agreed before each stage.
11 // LIMITS
Constraints and responsibility
Critical local functions are designed not to depend on the cloud; remote access and alerts resume when connectivity returns. Backup power is sized separately. Before diagnostics we do not promise every model is repairable, a specific temperature reduction, guaranteed hash rate or test duration. Stage results are measurement-based.
12 // FAQ
Frequently asked questions
Will the final price match the package price?
Yes when the site fits the stated boundaries. Any change is agreed before procurement. The page states exclusions and price factors explicitly.
What is needed for an exact scope and estimate?
Site plan, photos of panels and equipment, available drawings, target date and a responsible contact.
Which ASIC models do you support?
We check model, board revision and symptom before accepting the stage. Repair, monitoring or training support is confirmed from those inputs.
How does work start?
With project inputs and paid diagnostics or an engineering sprint. You receive a defined deliverable, not free design work in chat.
13 // NEXT
Related solutions
14 // REQUEST
Request for the selected service
Temperatures, hash rate, power, network, alerts and controlled actions with an audit trail.