01 // Client outcome
NORRIS // MINING ENGINEERING
ASIC diagnostics and repair in Bishkek
Diagnostics determines repairability and price. We do not promise every model can be repaired or a guaranteed hash rate.
ASIC diagnostics
1,500 KGSInitial diagnostics for one device, excluding repair.
Timeline: After intake02 // Who it is for
Farm owners, mining hotels, service companies and technical teams.
03 // Problems solved
It will not start, is unstable, reports an error or no longer performs its business task. We start with the observed symptom, not with buying parts. Diagnostics determines repairability and price. We do not promise every model can be repaired or a guaranteed hash rate.
04 // PRICE
Packages, price and boundaries
Indicative pricing for the stated scope. We confirm the price and timeline after reviewing your task, before paid work begins.
ASIC diagnostics
1,500 KGS
Timeline: After intake
Initial diagnostics for one device, excluding repair.
Priced separately: Spare parts, replacement equipment and work beyond the agreed diagnostics. Repair scope is listed in a separate estimate.
Select packageCleaning
3,500 KGS
Timeline: Per service queue
Disassembly, cleaning and control check of one device.
Priced separately: Spare parts, replacement equipment and work beyond the agreed diagnostics. Repair scope is listed in a separate estimate.
Select packageFirmware and software
from 2,500 KGS
Timeline: After diagnostics
Software recovery for compatible hardware.
Priced separately: Spare parts, replacement equipment and work beyond the agreed diagnostics. Repair scope is listed in a separate estimate.
Select packageControl board
4,500 KGS–12,000 KGS
Timeline: After diagnostics
Control-board repair within the agreed scope.
Priced separately: Spare parts, replacement equipment and work beyond the agreed diagnostics. Repair scope is listed in a separate estimate.
Select packagePower supply
6,500 KGS–18,000 KGS
Timeline: After diagnostics
Power-supply repair within the agreed scope.
Priced separately: Spare parts, replacement equipment and work beyond the agreed diagnostics. Repair scope is listed in a separate estimate.
Select packageHashboard
8,500 KGS–25,000 KGS
Timeline: After diagnostics
Repair of one board; final price depends on the fault and component availability.
Priced separately: Spare parts, replacement equipment and work beyond the agreed diagnostics. Repair scope is listed in a separate estimate.
Select packageWhat is included
Initial diagnostics for one device, excluding repair.
What changes the price
Cost depends on the model, access to the assembly and documentation, damage, previous repairs and availability of suitable components. The estimate requires: ASIC model, firmware version, affected assembly, log message, fan condition and history of overheating or repair. The model and observed symptom are enough to begin an enquiry.
05 // SYSTEM
What we inspect
We start with the ASIC model and logs, then inspect power, control and hashboards within the agreed diagnostic scope. A repair decision follows fault isolation.
06 // STACK
Equipment and integrations
We start with the ASIC model and logs, then inspect power, control and hashboards within the agreed diagnostic scope. A repair decision follows fault isolation. First we diagnose the reported fault. Suitable parts and test conditions are selected for the specific model.
07 // FALLBACK
Before handing over for repair
Testing accounts for firmware, cooling and power conditions. Repairing an assembly does not include fixing site power or cooling issues; those are scoped separately.
08 // INPUT
What we need from the client
ASIC model, firmware version, affected assembly, log message, fan condition and history of overheating or repair. The model and observed symptom are enough to begin an enquiry.
09 // LAUNCH
Diagnostics and repair process
1. Clarify model and symptoms. 2. Agree diagnostics. 3. Provide findings and a repair estimate. 4. Carry out agreed work. 5. Check the result and return the equipment. Inputs for this service: ASIC model, firmware version, affected assembly, log message, fan condition and history of overheating or repair. The model and observed symptom are enough to begin an enquiry.
10 // SCENARIO
Inspection outcome
We start with the ASIC model and logs, then inspect power, control and hashboards within the agreed diagnostic scope. A repair decision follows fault isolation.
11 // LIMITS
Constraints and responsibility
Testing accounts for firmware, cooling and power conditions. Repairing an assembly does not include fixing site power or cooling issues; those are scoped separately. Spare parts and additional faults are agreed separately. Repair feasibility and timing are determined after inspecting the specific device.
12 // FAQ
Frequently asked questions
Will the final price match the package price?
Yes when the site fits the stated boundaries. Any change is agreed before procurement. The page states exclusions and price factors explicitly.
What is needed for an exact scope and estimate?
ASIC model, firmware version, affected assembly, log message, fan condition and history of overheating or repair. The model and observed symptom are enough to begin an enquiry.
Can you estimate a repair from the symptoms?
The model and symptoms help us define the next step and diagnostic scope. The repair estimate depends on inspection findings; parts and paid work are agreed before proceeding.
How does work start?
ASIC model, firmware version, affected assembly, log message, fan condition and history of overheating or repair. The model and observed symptom are enough to begin an enquiry.
Related solutions
14 // REQUEST
Contact us
Diagnostics determines repairability and price. We do not promise every model can be repaired or a guaranteed hash rate.