Skip to content

NORRIS // MINING ENGINEERING

ASIC diagnostics and repair in Bishkek

Diagnostics determines repairability and price. We do not promise every model can be repaired or a guaranteed hash rate.

ASIC diagnostics

1,500 KGS

Initial diagnostics for one device, excluding repair.

Timeline: After intake

01 // Client outcome

Diagnostics determines repairability and price. We do not promise every model can be repaired or a guaranteed hash rate.

02 // Who it is for

Farm owners, mining hotels, service companies and technical teams.

03 // Problems solved

We find overloads, thermal pockets, unstable power, network gaps and recurring failures from measurements and logs. Diagnostics determines repairability and price. We do not promise every model can be repaired or a guaranteed hash rate.

04 // PRICE

Packages, price and boundaries

Prices pending approval before publication

ASIC diagnostics

1,500 KGS

Timeline: After intake

Initial diagnostics for one device, excluding repair.

Priced separately: Parts, consumables, power and repair equipment, logistics and work outside the agreed stage.

Select package

Cleaning

3,500 KGS

Timeline: Per service queue

Disassembly, cleaning and control check of one device.

Priced separately: Parts, consumables, power and repair equipment, logistics and work outside the agreed stage.

Select package

Firmware and software

from 2,500 KGS

Timeline: After diagnostics

Software recovery for compatible hardware.

Priced separately: Parts, consumables, power and repair equipment, logistics and work outside the agreed stage.

Select package

Control board

4,500 KGS–12,000 KGS

Timeline: After diagnostics

Control-board repair within the agreed scope.

Priced separately: Parts, consumables, power and repair equipment, logistics and work outside the agreed stage.

Select package

Power supply

6,500 KGS–18,000 KGS

Timeline: After diagnostics

Power-supply repair within the agreed scope.

Priced separately: Parts, consumables, power and repair equipment, logistics and work outside the agreed stage.

Select package

Hashboard

8,500 KGS–25,000 KGS

Timeline: After diagnostics

Repair of one board; final price depends on the fault and component availability.

Priced separately: Parts, consumables, power and repair equipment, logistics and work outside the agreed stage.

Select package

What is included

Initial diagnostics for one device, excluding repair.

What changes the price

Cost depends on capacity, ASIC count and models, cooling scheme, panel and network condition, operating mode and required test depth. The estimate requires: Site plan, photos of panels and equipment, available drawings, target date and a responsible contact.

05 // SYSTEM

How the system works

Work is based on measurements, logs and control tests; outcome boundaries are agreed before each stage.

SENSORCONTROLAPP

06 // STACK

Equipment and integrations

Work is based on measurements, logs and control tests; outcome boundaries are agreed before each stage. Measurement, network and repair equipment is selected for the ASIC models and task. We do not claim unverified partnerships or manufacturer certification.

07 // FALLBACK

If internet or power fails

Critical local functions are designed not to depend on the cloud; remote access and alerts resume when connectivity returns. Backup power is sized separately.

08 // INPUT

What we need from the client

Site plan, photos of panels and equipment, available drawings, target date and a responsible contact.

09 // LAUNCH

Launch sequence

1. Measure load, temperatures and network facts. 2. Document calculations and risks. 3. Agree the upgrade, repair or training stage. 4. Test under the agreed load. 5. Hand over logs and procedures. Inputs for this service: Site plan, photos of panels and equipment, available drawings, target date and a responsible contact.

Diagnostics and design are separate paid deliverables. Materials are procured after scope approval and prepayment.

10 // SCENARIO

Engineering scenario

Solution diagram — not a published case study

Work is based on measurements, logs and control tests; outcome boundaries are agreed before each stage.

11 // LIMITS

Constraints and responsibility

Critical local functions are designed not to depend on the cloud; remote access and alerts resume when connectivity returns. Backup power is sized separately. Before diagnostics we do not promise every model is repairable, a specific temperature reduction, guaranteed hash rate or test duration. Stage results are measurement-based.

12 // FAQ

Frequently asked questions

Will the final price match the package price?

Yes when the site fits the stated boundaries. Any change is agreed before procurement. The page states exclusions and price factors explicitly.

What is needed for an exact scope and estimate?

Site plan, photos of panels and equipment, available drawings, target date and a responsible contact.

Which ASIC models do you support?

We check model, board revision and symptom before accepting the stage. Repair, monitoring or training support is confirmed from those inputs.

How does work start?

With project inputs and paid diagnostics or an engineering sprint. You receive a defined deliverable, not free design work in chat.

14 // REQUEST

Request for the selected service

Diagnostics determines repairability and price. We do not promise every model can be repaired or a guaranteed hash rate.

Send photos, video and drawings securely in WhatsApp after creating the request.

WhatsApp