01 // Client outcome
NORRIS // ENGINEERING SYSTEM
Equipment and engineering-system monitoring
We install measurement of temperature, power, doors, leaks and alarm signals at a specific site.
Start
29,900 KGS + 2,490 KGS/monthUp to three monitored parameters, controller, dashboard and alert setup.
Timeline: 1–2 business days02 // Who it is for
Cold-chain sites, server rooms, warehouses, production and remote utility rooms.
03 // Problems solved
We connect field wiring, power, network, controllers and software so responsibility does not disappear between contractors. Installed sensors, verified thresholds and a response instruction for each alarm.
04 // PRICE
Packages, price and boundaries
Prices pending approval before publication
Start
29,900 KGS + 2,490 KGS/month
Timeline: 1–2 business days
Up to three monitored parameters, controller, dashboard and alert setup.
Priced separately: Equipment, production batches, licences, publishing accounts, statutory approvals and third-party work.
Select packageControl
69,900 KGS + 3,990 KGS/month
Timeline: 3–5 business days
Up to eight signals, two control outputs, history and automation rules.
Priced separately: Equipment, production batches, licences, publishing accounts, statutory approvals and third-party work.
Select packageSite network
from 149,000 KGS
Timeline: From 5 business days
Multiple sites, roles, a unified dashboard and escalation rules.
Priced separately: Equipment, production batches, licences, publishing accounts, statutory approvals and third-party work.
Select packageWhat is included
Up to three monitored parameters, controller, dashboard and alert setup.
What changes the price
Price depends on integration boundaries, interface count, source documentation, resilience requirements, app publication and support. The estimate requires: Site plan, photos of panels and equipment, available drawings, target date and a responsible contact.
05 // SYSTEM
How the system works
Field sensors connect to a controller; local rules record the alarm, while Norris Control stores history and sends notifications.
06 // STACK
Equipment and integrations
Field sensors connect to a controller; local rules record the alarm, while Norris Control stores history and sends notifications. Components are selected by protocol, serviceability and documentation. Architecture, models, software versions and code ownership are fixed before implementation.
07 // FALLBACK
If internet or power fails
Critical local functions are designed not to depend on the cloud; remote access and alerts resume when connectivity returns. Backup power is sized separately.
08 // INPUT
What we need from the client
Site plan, photos of panels and equipment, available drawings, target date and a responsible contact.
09 // LAUNCH
Launch sequence
1. Collect inputs. 2. Run a paid engineering sprint. 3. Freeze architecture, interfaces and outcome. 4. Deliver in stages. 5. Run acceptance tests and hand over documentation. Inputs for this service: Site plan, photos of panels and equipment, available drawings, target date and a responsible contact.
Diagnostics and design are separate paid deliverables. Materials are procured after scope approval and prepayment.
10 // SCENARIO
Engineering scenario
Field sensors connect to a controller; local rules record the alarm, while Norris Control stores history and sends notifications.
11 // LIMITS
Constraints and responsibility
Critical local functions are designed not to depend on the cloud; remote access and alerts resume when connectivity returns. Backup power is sized separately. We do not design technical solutions for free in chat. Third-party licences, publishing accounts, approvals and work outside the frozen interface are listed separately.
12 // FAQ
Frequently asked questions
Will the final price match the package price?
Yes when the site fits the stated boundaries. Any change is agreed before procurement. The page states exclusions and price factors explicitly.
What is needed for an exact scope and estimate?
Site plan, photos of panels and equipment, available drawings, target date and a responsible contact.
Who owns the code, data and accounts?
Rights, repositories, domains, app stores and access are documented in the contract and stage architecture before implementation.
How does work start?
With project inputs and paid diagnostics or an engineering sprint. You receive a defined deliverable, not free design work in chat.
13 // NEXT
Related solutions
14 // REQUEST
Request for the selected service
We install measurement of temperature, power, doors, leaks and alarm signals at a specific site.