Skip to content

NORRIS // FULL-CYCLE MINING

Mining operations under control, from paperwork to daily production

We help validate the project before investment, prepare the site, commission equipment and establish operations without blind spots. Legal, administrative, engineering and service work is coordinated in one clear plan.

Consultation starts at KGS 20,000 per hour. We review the questionnaire before the call and provide a written next-step list afterwards.

01 // TWO LEVELS OF CONTROL

A local monitor for a quick start. Norris Control for distributed operations.

The operator sees the farm on a computer. In the paid environment, managers get remote access, roles, events and approved actions. The mobile screen below shows the Norris Control interface direction. ASIC functions are fixed after model and firmware verification.

Norris Farm Monitor
Blurred Norris Farm Monitor interface preview
FREE // UP TO 19 ASIC
Blurred Norris Control iOS app preview
PAID // REMOTE OPERATIONS

Interfaces are shown with a soft blur. The full screen is available after registration or during a project presentation.

02 // FREE TOOL

Norris Farm Monitor up to 19 ASIC

Free local Windows version 1.0.19: S19-series ASIC discovery on your network, status grid, history, diagnostics and PDF report.

FreeDownload after registration

Separate: Cloud access, remote commands, guaranteed compatibility outside the verified list and on-site implementation.

Register the free edition

Registration unlocks the installer and portable archive for version 1.0.19.

03 // WHERE OPERATIONS LOSE MONEY

A full cycle means no critical issue is left between contractors

The failure is rarely only inside an ASIC. Availability can be lost to a power contract, overheated input, hot-air recirculation, a network loop, random firmware, missing spares or an unclear night-shift procedure. We split the project into eight operating systems.

01

Legal and administrative

Business structure, contracts, right to use the site, energy terms, tax model, insurance, labour safety, virtual-asset requirements and internal authority. We coordinate documents and decision owners. Formal opinions are issued by qualified specialists in the relevant jurisdiction.

02

Economics before equipment purchase

We include capacity, delivery, switchgear, cable, cooling, network, spares, repair, people, downtime and heat rejection. We do not promise return or payback without a model.

03

Electrical and safety

Actual load, incoming supply, phase balance, protection, selectivity, cable, connections, grounding, emergency shutdown, fire risks and maintainability.

04

Cooling, dust and noise

Intake, exhaust, hot-air recirculation, ASIC inlet temperature, filtration, contamination, condensation, altitude, seasonal modes and noise. Decisions rely on measurement and equipment documentation.

05

Network, pools and access

Address plan, segmentation, link backup, latency, pool list, credential handling, change log and a separate remote-service procedure. ASIC panels are not exposed to the public internet.

06

Firmware, monitoring and control

Models, revisions and firmware are recorded. Thresholds, alerts, roles, history and approved commands are configured. Updates start with a test group and a rollback plan.

07

Repair and spares

Intake diagnostics, queue, repairability criteria, post-repair test, control board, PSU and hashboard records, fans, cable and consumable stock.

08

Team and daily operations

Shifts, rounds, cleaning, incident log, escalation levels, remote actions, electrical access, management reports and shift handover.

04 // WHAT WE CAN OWN

From one difficult decision to the technical office for the entire farm

Norris can perform a separate audit or coordinate the whole project. Responsibility, measurable outcome and exclusions are agreed before each stage.

Concept and site review

Technical due diligence of capacity, layout, cooling, network, budget and schedule risks.

Design and procurement

Inputs, engineering sections, specifications, bid comparison, substitution and compatibility control.

Commissioning and acceptance

Installation control, labelling, addressing, load tests, issue list, documents and operations handover.

Monitoring and supervision

A free local tool, cloud edition, roles, alerts, reports, integrations and safe commands.

Scheduled maintenance

Rounds, cleaning, thermal and electrical checks, network tests, updates, spares and prevention.

Diagnostics and repair

Log review, fault isolation and repair of control boards, PSUs and hashboards within verified boundaries.

Team training

Practical programmes for operators, shift leads, network staff and repair engineers.

Technical office

Owner reporting, contractor control, improvement planning, maintenance budgets and serious incident reviews.

05 // HOW TO START WITHOUT WASTE

Reduce uncertainty first, design next, buy afterwards

  1. 01

    Questionnaire

    Country, site, ASIC models and count, capacity, network, budget, target date and document status.

  2. 02

    Consultation

    Review the main risk in 60 minutes and choose the next paid stage.

  3. 03

    Survey

    Verify documents and actual site condition. Measurements matter more than assumptions.

  4. 04

    Technical solution

    Freeze calculations, drawings, scope, interfaces, roles, acceptance criteria and exclusions.

  5. 05

    Procurement and installation

    Compare offers and control compatibility, changes, labelling and workmanship.

  6. 06

    Commissioning

    Test power, network, thermal modes, incidents, monitoring and recovery.

  7. 07

    Handover

    Deliver documents, access, asset register, procedures, training and maintenance plan.

  8. 08

    Operations

    Track events, analyse downtime, schedule prevention and improve from evidence.

06 // FORMATS FOR MEDIUM AND LARGE PROJECTS

Price is tied to a stage outcome, not a broad promise

These are starting points. The exact figure follows the input review. Each card states what is included and what is separate.

Mining project consultation

from 20,000 KGS

Timeline: 60 minutes

Pre-call questionnaire, video session with an engineer, review of the main risk and a written next-step list.

Separate: Engineering calculations, legal opinion and site visit.

Discuss this format

Technical due diligence

from 120,000 KGS

Timeline: 3–5 business days

Review of site inputs, capacity, layout, cooling, network, budget and critical risks before an investment decision.

Separate: Laboratory testing, equipment disassembly, legal and tax opinions.

Discuss this format

Turnkey site launch

from 450,000 KGS

Timeline: From 20 business days

Project management, engineering sections, contractor selection, installation control, commissioning, procedures and operations handover.

Separate: Equipment, construction, government fees, electrical capacity and third-party expert services.

Discuss this format

Farm technical office

from 300,000 KGS

Timeline: Per month of service

Performance oversight, incident review, maintenance planning, management reporting, contractor coordination and an improvement plan.

Separate: Spare parts, round-the-clock on-site staff, emergency visits and capital work.

Discuss this format

07 // PAID PLATFORM

Remote monitoring and control for current ASIC models

The expanded edition is designed for multiple sites and newer ASIC models. It adds telemetry, roles, events, reports and only those commands safely supported by the specific model and firmware.

Remote up to 100 ASICfrom 99,000 KGS + 14,900 KGS/month
Remote up to 500 ASICfrom 249,000 KGS + 39,900 KGS/month
  • API and firmware verification before compatibility is promised
  • Fast local operation with a remote server layer
  • Roles for owner, manager, operator and service team
  • History of events, changes and commands
  • Threshold alerts and escalation rules
  • Test-group updates with a rollback plan
View monitoring packages

08 // IMPORTANT LIMITS

What we do not promise before diagnostics and calculation

  • ×Return, fixed payback or hash-rate growth
  • ×Compatibility with an unknown model, firmware or closed protocol
  • ×Electrical or fire safety without a survey
  • ×Legal or tax opinion without a qualified specialist
  • ×Board repairability and repair cost without diagnostics
  • ×Round-the-clock SLA before people, spares and communication channels are agreed

09 // QUESTIONS

Key decisions before starting

Can we begin with a consultation only?

Yes. One hour starts at KGS 20,000. We review the questionnaire before the call.

Does the free software send farm data to the cloud?

No. Norris Farm Monitor is a local monitor for up to 19 ASIC units. Registration is required to download the licence, but operational data can remain on the local network.

Why is registration required before download?

It helps us understand real hardware usage, communicate important updates and avoid publishing an unexplained package link without licence context.

Are all new ASIC models supported?

The platform expands through adapters. We verify the exact model, API and firmware before contracting.

Can the server remain on our site?

Yes. An enterprise on-premise option is available. Server, backup, access and integrations are scoped after a survey.

Do you cover legal and tax work?

We coordinate requirements, documents, timelines and owners. Formal opinions and representation are delivered by qualified legal, accounting and licensed specialists.

10 // DISCUSS A PROJECT

Describe the site and the decision you need to make

If information is limited, begin with a consultation. If the project is already running, provide the observed issue, timeline and ASIC count.

Mining operations under control, from paperwork to daily operationsMining project consultation: from 20,000 KGSBishkekYou can change the details below
Request a call back

Enter a phone number so we can call you back. All other fields are optional.

Service and option

Mining operations under control, from paperwork to daily operations

Contact details
City or region
Task
Additional details

You can share photos and drawings in WhatsApp after contacting us.