01 // Client outcome
NORRIS // MINING ENGINEERING
Mining should hash. We handle the engineering.
Design, power, cooling, network, monitoring, ASIC repair, maintenance and engineer training.
Remote calculation
7,500 KGSLoad and heat calculation from supplied data.
Timeline: 1 business day02 // Who it is for
Farm owners, mining hotels, service companies and investors assessing a site.
03 // Problems solved
We find overloads, thermal pockets, unstable power, network gaps and recurring failures from measurements and logs. A site with measurable operating conditions, documentation, procedures and ownership for every subsystem.
04 // PRICE
Packages, price and boundaries
Prices pending approval before publication
Remote calculation
7,500 KGS
Timeline: 1 business day
Load and heat calculation from supplied data.
Priced separately: Parts, consumables, power and repair equipment, logistics and work outside the agreed stage.
Select packageSurvey up to 100 ASIC
25,000 KGS
Timeline: By agreement
Site inspection, measurements, constraints and project inputs.
Priced separately: Parts, consumables, power and repair equipment, logistics and work outside the agreed stage.
Select packageDesign up to 20 ASIC
49,000 KGS
Timeline: Per brief
Single-line diagram, layout, network, ventilation and bill of materials.
Priced separately: Parts, consumables, power and repair equipment, logistics and work outside the agreed stage.
Select packageDesign up to 100 ASIC
99,000 KGS
Timeline: Per brief
Engineering design for a site with up to 100 devices.
Priced separately: Parts, consumables, power and repair equipment, logistics and work outside the agreed stage.
Select packageDesign up to 500 ASIC
199,000 KGS
Timeline: Per brief
Power, cooling, network, security and monitoring sections.
Priced separately: Parts, consumables, power and repair equipment, logistics and work outside the agreed stage.
Select packageWhat is included
Load and heat calculation from supplied data.
What changes the price
Cost depends on capacity, ASIC count and models, cooling scheme, panel and network condition, operating mode and required test depth. The estimate requires: ASIC models and count, site power, electrical diagram, climate, layout, network and actual incident logs.
05 // SYSTEM
How the system works
Power, airflow, network and monitoring are engineered as connected systems; repair and training have separate measurable outcomes.
06 // STACK
Equipment and integrations
Power, airflow, network and monitoring are engineered as connected systems; repair and training have separate measurable outcomes. Measurement, network and repair equipment is selected for the ASIC models and task. We do not claim unverified partnerships or manufacturer certification.
07 // FALLBACK
If internet or power fails
Critical local functions are designed not to depend on the cloud; remote access and alerts resume when connectivity returns. Backup power is sized separately.
08 // INPUT
What we need from the client
ASIC models and count, site power, electrical diagram, climate, layout, network and actual incident logs.
09 // LAUNCH
Launch sequence
1. Measure load, temperatures and network facts. 2. Document calculations and risks. 3. Agree the upgrade, repair or training stage. 4. Test under the agreed load. 5. Hand over logs and procedures. Inputs for this service: ASIC models and count, site power, electrical diagram, climate, layout, network and actual incident logs.
Diagnostics and design are separate paid deliverables. Materials are procured after scope approval and prepayment.
10 // SCENARIO
Engineering scenario
Power, airflow, network and monitoring are engineered as connected systems; repair and training have separate measurable outcomes.
11 // LIMITS
Constraints and responsibility
Critical local functions are designed not to depend on the cloud; remote access and alerts resume when connectivity returns. Backup power is sized separately. Before diagnostics we do not promise every model is repairable, a specific temperature reduction, guaranteed hash rate or test duration. Stage results are measurement-based.
12 // FAQ
Frequently asked questions
Will the final price match the package price?
Yes when the site fits the stated boundaries. Any change is agreed before procurement. The page states exclusions and price factors explicitly.
What is needed for an exact scope and estimate?
ASIC models and count, site power, electrical diagram, climate, layout, network and actual incident logs.
Which ASIC models do you support?
We check model, board revision and symptom before accepting the stage. Repair, monitoring or training support is confirmed from those inputs.
How does work start?
With project inputs and paid diagnostics or an engineering sprint. You receive a defined deliverable, not free design work in chat.
13 // NEXT
Related solutions
14 // REQUEST
Request for the selected service
Design, power, cooling, network, monitoring, ASIC repair, maintenance and engineer training.