Skip to content

NORRIS // MINING ENGINEERING

Mining should hash. We handle the engineering.

Design, power, cooling, network, monitoring, ASIC repair, maintenance and engineer training.

Remote calculation

7,500 KGS

Load and heat calculation from supplied data.

Timeline: 1 business day

01 // Client outcome

A site with measurable operating conditions, documentation, procedures and ownership for every subsystem.

02 // Who it is for

Farm owners, mining hotels, service companies and investors assessing a site.

03 // Problems solved

We find overloads, thermal pockets, unstable power, network gaps and recurring failures from measurements and logs. A site with measurable operating conditions, documentation, procedures and ownership for every subsystem.

04 // PRICE

Packages, price and boundaries

Prices pending approval before publication

Remote calculation

7,500 KGS

Timeline: 1 business day

Load and heat calculation from supplied data.

Priced separately: Parts, consumables, power and repair equipment, logistics and work outside the agreed stage.

Select package

Survey up to 100 ASIC

25,000 KGS

Timeline: By agreement

Site inspection, measurements, constraints and project inputs.

Priced separately: Parts, consumables, power and repair equipment, logistics and work outside the agreed stage.

Select package

Design up to 20 ASIC

49,000 KGS

Timeline: Per brief

Single-line diagram, layout, network, ventilation and bill of materials.

Priced separately: Parts, consumables, power and repair equipment, logistics and work outside the agreed stage.

Select package

Design up to 100 ASIC

99,000 KGS

Timeline: Per brief

Engineering design for a site with up to 100 devices.

Priced separately: Parts, consumables, power and repair equipment, logistics and work outside the agreed stage.

Select package

Design up to 500 ASIC

199,000 KGS

Timeline: Per brief

Power, cooling, network, security and monitoring sections.

Priced separately: Parts, consumables, power and repair equipment, logistics and work outside the agreed stage.

Select package

What is included

Load and heat calculation from supplied data.

What changes the price

Cost depends on capacity, ASIC count and models, cooling scheme, panel and network condition, operating mode and required test depth. The estimate requires: ASIC models and count, site power, electrical diagram, climate, layout, network and actual incident logs.

05 // SYSTEM

How the system works

Power, airflow, network and monitoring are engineered as connected systems; repair and training have separate measurable outcomes.

SENSORCONTROLAPP

06 // STACK

Equipment and integrations

Power, airflow, network and monitoring are engineered as connected systems; repair and training have separate measurable outcomes. Measurement, network and repair equipment is selected for the ASIC models and task. We do not claim unverified partnerships or manufacturer certification.

07 // FALLBACK

If internet or power fails

Critical local functions are designed not to depend on the cloud; remote access and alerts resume when connectivity returns. Backup power is sized separately.

08 // INPUT

What we need from the client

ASIC models and count, site power, electrical diagram, climate, layout, network and actual incident logs.

09 // LAUNCH

Launch sequence

1. Measure load, temperatures and network facts. 2. Document calculations and risks. 3. Agree the upgrade, repair or training stage. 4. Test under the agreed load. 5. Hand over logs and procedures. Inputs for this service: ASIC models and count, site power, electrical diagram, climate, layout, network and actual incident logs.

Diagnostics and design are separate paid deliverables. Materials are procured after scope approval and prepayment.

10 // SCENARIO

Engineering scenario

Solution diagram — not a published case study

Power, airflow, network and monitoring are engineered as connected systems; repair and training have separate measurable outcomes.

11 // LIMITS

Constraints and responsibility

Critical local functions are designed not to depend on the cloud; remote access and alerts resume when connectivity returns. Backup power is sized separately. Before diagnostics we do not promise every model is repairable, a specific temperature reduction, guaranteed hash rate or test duration. Stage results are measurement-based.

12 // FAQ

Frequently asked questions

Will the final price match the package price?

Yes when the site fits the stated boundaries. Any change is agreed before procurement. The page states exclusions and price factors explicitly.

What is needed for an exact scope and estimate?

ASIC models and count, site power, electrical diagram, climate, layout, network and actual incident logs.

Which ASIC models do you support?

We check model, board revision and symptom before accepting the stage. Repair, monitoring or training support is confirmed from those inputs.

How does work start?

With project inputs and paid diagnostics or an engineering sprint. You receive a defined deliverable, not free design work in chat.

14 // REQUEST

Request for the selected service

Design, power, cooling, network, monitoring, ASIC repair, maintenance and engineer training.

Send photos, video and drawings securely in WhatsApp after creating the request.

WhatsApp