01 // Client outcome
NORRIS // READY SOLUTION
Hotel automation: access, rooms and check-in
The guest pays, receives temporary access and checks in without waiting for reception.
Digital access
from 24,900 KGSOne door: lock or controller, temporary credentials and master access.
Timeline: From 1 business day02 // Who it is for
Hotels, guest houses, aparthotels and self-check-in properties.
03 // Problems solved
We remove manual operations, unconfirmed states and gaps between equipment, people and reports. A managed flow from booking and payment to access revocation and room status.
04 // PRICE
Packages, price and boundaries
Prices pending approval before publication
Digital access
from 24,900 KGS
Timeline: From 1 business day
One door: lock or controller, temporary credentials and master access.
Priced separately: Building work, concealed-cable recovery, backup power and functions outside the package scope.
Select packageSmart room
from 49,900 KGS
Timeline: From 2 business days
Access, room status and basic climate or power control.
Priced separately: Building work, concealed-cable recovery, backup power and functions outside the package scope.
Select packageSelf check-in
from 249,000 KGS
Timeline: 10–20 business days
Payment, temporary access issue/revocation, audit trail and integration.
Priced separately: Building work, concealed-cable recovery, backup power and functions outside the package scope.
Select packageSmart hotel
from 600,000 KGS
Timeline: After site survey
Access, rooms, climate, network, alarms and a unified dashboard.
Priced separately: Building work, concealed-cable recovery, backup power and functions outside the package scope.
Select packageWhat is included
One door: lock or controller, temporary credentials and master access.
What changes the price
Price changes with the number of doors, zones, rooms and scenarios, cable runs, existing equipment and backup requirements. The estimate requires: Site plan, photos of panels and equipment, available drawings, target date and a responsible contact.
05 // SYSTEM
How the system works
The PMS or booking flow confirms payment, the system issues time-limited access, keeps an audit trail and revokes access after checkout.
06 // STACK
Equipment and integrations
The PMS or booking flow confirms payment, the system issues time-limited access, keeps an audit trail and revokes access after checkout. Controllers, sensors, actuators and interfaces are selected after physical compatibility checks. Models are fixed in the specification.
07 // FALLBACK
If internet or power fails
Critical local functions are designed not to depend on the cloud; remote access and alerts resume when connectivity returns. Backup power is sized separately.
08 // INPUT
What we need from the client
Site plan, photos of panels and equipment, available drawings, target date and a responsible contact.
09 // LAUNCH
Launch sequence
1. Validate package boundaries. 2. Freeze points and scenarios. 3. Prepare equipment. 4. Install and configure. 5. Test every scenario and hand over instructions. Inputs for this service: Site plan, photos of panels and equipment, available drawings, target date and a responsible contact.
Diagnostics and design are separate paid deliverables. Materials are procured after scope approval and prepayment.
10 // SCENARIO
Engineering scenario
The PMS or booking flow confirms payment, the system issues time-limited access, keeps an audit trail and revokes access after checkout.
11 // LIMITS
Constraints and responsibility
Critical local functions are designed not to depend on the cloud; remote access and alerts resume when connectivity returns. Backup power is sized separately. Automation does not replace mechanical protection or manual override. Warranty covers the agreed scope; third-party work and approvals are separate.
12 // FAQ
Frequently asked questions
Will the final price match the package price?
Yes when the site fits the stated boundaries. Any change is agreed before procurement. The page states exclusions and price factors explicitly.
What is needed for an exact scope and estimate?
Site plan, photos of panels and equipment, available drawings, target date and a responsible contact.
What continues to work if connectivity is lost?
Agreed local scenarios and safe manual control continue. Cloud history, external alerts and remote commands resume when connectivity returns.
How does work start?
With project inputs and paid diagnostics or an engineering sprint. You receive a defined deliverable, not free design work in chat.
13 // NEXT
Related solutions
14 // REQUEST
Request for the selected service
The guest pays, receives temporary access and checks in without waiting for reception.